Run313 (S310) beam test
Other information are coming !
Purpose: Slow down 64Ni beam at S4

Software information

NOTE: Scintillator Sc42 was installed at S4 behind a vacuum tube and in front CATE detector.
Period Run file User DAQ code Analysis code
May'07 RUN313 rising rising/mbsurun/may_2007 /misc/rising/plamen/Go4v2

Hardware information

TA S1 S2 S3 S4
Seetram - SC21 (3 mm) - 2 MUSICs + MWs + SC41(5 mm) + Sc42 +cate +monoenergetic degrader

Technical problems

1. No signals from MW21.
2. Two anodes ch. 4 and 5 of MUSIC1 were bad.

 » Detector summary at the end of the run.

 