S247 Other information are coming !
Purpose: Elastic and inelastic scattering of 11,12,14Be isotopes
Software information
NOTE:
| Period |
Run file |
User |
DAQ code |
Analysis code |
| May '06 |
R147 |
profi |
mbsrun/run147 |
/d/frs01/profi/run147/test |
Hardware information
| TA |
S1 |
S2 |
S3 |
S8 |
Seetram 9Be ( g/cm^2) |
degreder |
disc |
- |
SC81( mm) |
Technical problems
1. The power supply of the dipole TS3MU1 had several times a high temperature;
it has been resetted and worked but once the power supply has been burned, the reparation took one day.
2. The power supply of the quadrupole magnet TS3QD12 had several times a high temperature; it has been reset
and worked further.
3. The amplitude form the left PMT of S8 scintillator became weaker during the experiment.
4. The target holder could not be moved by the motor – has been set to one position for the whole run.
5. The forvacuum pump at the target section stopped and has been exchanged.
6. The turbomolecular pump at the target section stopped and has been exchanged.
|
|
|