|
You are in
GSI » FRS » Research » New experiments » S271
S271 Purpose: Two proton decay of 19Mg
» Proposal
Test (Nov '05)
The aim was to test the experimental setup to be used in the detection of the 19Mg decay
products. A 8B secondary beam on a Be target was used. The reconstruction and identification
of the 7Be + p breakup channel was performed, where the 7Be fragments were accepted
by the second half of the FRS and identified at the S4 focal, while the protons were detected by means of two
micro-strip detectors positioned just behind the S2 target.
Software information
NOTE:
| Period |
Run file |
User |
DAQ code |
Analysis code |
| Nov '05 |
R140 |
profi |
mbsrun/expks |
/d/frs01/profi/s271 |
Hardware information
| TA |
S1 |
S2 |
S4 |
Seetram 9Be (4 g/cm^2) |
degreder |
MW21, MW22, SC21 ( mm), Be( mg/cm^2), DSSD, microstrips |
MW41, MW42, MUSIC1, SC41( mm) |
Technical problems
1. Scaler channels.
2. 5 DSSD channels died during the run (cables to ADC or ADC itself ?).
3. Delays for ToF between S2-S4 were not set properly.
Experiment (Aug '06)
To do list for the preparation of the main run is
here.
»
Ivan's transparencies
»
Experimental plan with the FRS setttings
List of participants.
|
|
|
Comments? Questions? Error reports? Please contact the
webmaster!
The FRS web pages have been accessed 26968 times since October 27, 2003!
Script file last updated on July 18, 2007.
|
| |