Turn off H2-Target

 

Evaporation of Hydrogen:

 

Open the valve PV01

Stop compressor

Open the valves MV03 and MV04

„Stop“ on the PC in the electronic rack

            if no function:   

            „quit“

            >frs                  in key  „FRS“

            F1-key

            click on „Local“

            click on „Stop“

            „Experiment stopped“ in a red frame appears

 

After two days:

 

 

Pumping out Hydrogen and filling with Nitrogen:

 

Close MV01 (close to the H2 storage tank, retaining ring!)

Close MV05 and MV11

Open MV06, MV07 and MV09

Switch on pump RP02

Open slowly MV10

Switch on PG01 (Vacuum gauge of the target)

Wait until pressure is <0.1 mbar

Close PV01

Stop pumps TP01 and RP01

Tap on back-pressure valves RV01 to RV05 (in cryo rack) with a soft tool (e.g. plastic hammer)!

CloseMV10

Switch off PG01

Switch off RP02

Open N2-cylinder and adjust the reducing valve at approx. 0.4 bar at the PI06

Open MV05 slowly (intermittent) and fill Target at about 1.2 bar

Close MV05

Switch off IG01 (rear panel!)

Switch off screens of the PC

 

 

 

 

 